Morse Engineering and Construction Industries


Recent Posts

Archive

Can You Install A Septic System In The Winter?

- Friday, January 13, 2023
Morse Engineering and Construction - Can You Install A Septic System In The Winter?

Installing a septic tank in winter requires careful planning and adherence to local regulations. Here are the 10 general steps to take when installing a septic tank in winter:

  1. Determine the appropriate location for the septic tank. This will typically be at least 10 feet away from the home and any other buildings, and away from bodies of water or slope.
  2. Obtain the necessary permits. You will need to obtain a permit from the local health department before installing a septic tank.
  3. Choose the size of the septic tank. The size of the septic tank will depend on the size of your home and the number of people living in it. A larger tank may be necessary if you have a large family or expect a lot of water usage.
  4. Excavate the site. Once you have chosen the location for the septic tank, you will need to excavate the site to make room for the tank. This will require the use of heavy machinery, such as a backhoe.
  5. Install the tank. The septic tank should be placed in the excavation and leveled to ensure proper operation. The tank should also be anchored to prevent movement.
  6. Connect the tank to the home. The septic tank will need to be connected to the home via a series of pipes. These pipes will transport the waste water from the home to the septic tank.
  7. Install the drain field. The drain field, also known as the leach field, is a series of trenches or beds where the effluent can be filtered and absorbed into the soil. The drain field should be located at least 50 feet from any water source.
  8. Backfill and grade the site. Once the septic tank and drain field are installed, you will need to backfill the excavation and grade the site to ensure proper drainage.
  9. Activate the septic bacteria. Septic tanks rely on bacteria to break down and digest the wastewater and solid matter. You can help to jumpstart the bacterial process by adding a bacterial activator to the tank. This can help to speed up the digestion process and ensure that the septic system is functioning properly.
  10. Test the system. After the septic tank has been installed, it is important to test the system to ensure that it is functioning properly. This may involve testing the water levels in the tank and observing the drain field to ensure that the wastewater is being properly absorbed into the soil.

For more information, contact Morse Engineering and Construction.

Source: ecotate.com


New Septic System Installation: What's Involved

- Friday, January 06, 2023
Morse Engineering and Construction - New Septic System Installation

When building a home, one of the many aspects you have to consider is the sewer disposal system. Here’s what you should expect during the entire installation process.

3 Steps for Installing a New Septic System

1. Apply for Site Evaluation

Not every property is suitable for a septic system. Therefore, the site needs to be evaluated first. The soil is tested for its porosity, texture, and other factors that affect its ability to hold and drain water. Licensed inspectors from the local health department will run a percolation test to determine what system will work best under the existing conditions. They do this to prevent any potential contamination of the aquifer.

Apart from the soil, they will also look at the topography, landscape position, and groundwater conditions to identify which area is ideal for the drainfield. They will recommend the type and size of the septic system that works best on your property after seeing the site in person and comparing it against the submitted proposed structural layout.

2. Obtain Permit for Installation

Once you have received the results after the inspection, you must provide this to a certified septic tank and system installer. They should draft a detailed plan of the system to be submitted to the local health department for approval first before obtaining the building permit.

Keep in mind that the permit is only valid for one year, so refrain from delaying the installation. However, that doesn’t mean you have to rush the process—take the time to research the licensed local contractors before hiring one. Get at least three estimates from different companies to have a better gauge of the costs. Don’t forget to run a comprehensive check on their credentials as well.

3. Inspection by the Health Department After the Installation

After the septic tank and pipes have been laid down in their places, you have to notify the local health department for a final site inspection. This last step ensures that the septic system follows the requirements indicated on the permit and preliminary site inspection. If the inspector sees that everything is up to par, they will green-light its use.

For more information, contact Morse Engineering and Construction.

Source: connect2local


New Year’s Greetings

- Thursday, December 29, 2022

New Year’s Greetings

We hope calendar year 2022 was memorable for all the right reasons and leaves you with only life-long heart-warming memories. As the dawn of the new year approaches, we extend our best wishes for the same throughout 2023. It is truly a privilege to serve you and to be uplifted by you. From all of us here at Morse Engineering & Construction we thank you and wish you all a happy, healthy, and prosperous New Year!


Steps for Getting a New Septic System

- Friday, December 23, 2022
Morse Engineering and Construction

Improper septic disposal on your property affects not only you and your family but also the community at large. As such, municipalities have set regulations and guidelines for how to safely and responsibly install a septic system. A septic system design company can help you to understand and adhere to these rules while devising the most efficient strategy for handling your septic waste. Before you get started, here’s a guide at some of the steps you’ll need to take.

What Are the Necessary Steps for Installing a Septic System?

1. Understand Regulations

Regulations on septic systems vary across states, so check with local authorities on current laws and rules that may apply. The state environmental agency and health department will have the necessary information on their websites or at their offices. Do a quick search to identify the governing agency, then go from there.

2. Know the Required Permits

Like most construction projects, installing a septic system requires permits. Again, the necessary paperwork differs from one place to another. Before the local agency issues the permits and gives you the green light, they have to ensure first that your chosen site is suitable for construction. Most septic system installers are familiar with the permitting process, and they can handle everything for a fee.

3. Conduct Site Evaluation

The local agency will test the soil to determine the most efficient system for it. Some soil conditions are inefficient at filtering wastewater or have high water tables, increasing the risk of contamination. In such scenarios, an aerobic septic system works better than an anaerobic one.

4. Design the System

After the site assessment, septic system design companyit’s time to bring in a septic system design company. They will draft a wastewater treatment system that meets your needs while accounting for any limitations and restrictions in the design. There’s no one-size-fits-all when it comes to septic systems because of marked differences in property layouts.

5. Obtain Approval

Plans for your septic system have to be approved by the local agency first before actual work begins. It must meet the set standards and regulations; otherwise, your septic system design company will have to go back to the drawing board. Once the system is considered safe and won’t contaminate water sources, installation can commence.

For more information, contact Morse Engineering and Construction.

Source: connect2local


An Appreciative Happy Holidays Wish from All of Us

- Friday, December 16, 2022
Happy Holidays

The holidays have arrived. As we write this, we continue to do our very best to meet and exceed your expectations. Simultaneously, our hearts are filled with Holiday joy, too many to itemize fully. One of our greatest joys is our appreciation of you. Please know how much we value and are personally rewarded by our relationship.

For warming our hearts and for thinking of us when our business can meet your needs, everyone here at Morse Engineering & Construction Industries offers our thanks and heartfelt greetings for a Merry Christmas, a Happy Hanukkah, and joyful wishes for your every holiday celebration.


The Septic Design Process

- Friday, December 09, 2022
Morse Engineering and Construction - The Septic Design Process

Septic systems can be installed on most properties, fitted to new construction, or built into an existing structure’s plumbing system. However, there’s more to septic design than simply identifying the best location for the tank and drainage field. Before the system is installed, here’s what to expect from your design consultation with an experienced engineering firm.

Preliminary Tests & Design Work

Before beginning the septic design process, the property’s soil needs to be examined through a percolation (perc) test. This test determines how quickly water is absorbed into the soil and allows the engineer to recommend the proper septic tank system for the site. They’ll map out the best location, tank size, type, and drain field arrangement for the property.

Once the appropriate design is determined, the consultant will help you file the paperwork with the city or county so construction can begin. Without the proper permits in place, the septic system cannot be installed. Also, moving forward without the right documentation in place could result in hefty fines. Once the engineering firm secures the permits, they’ll help you find the right septic installation company to ensure everything is completed up to current building codes and regulations.

Why Septic Design Is Important

Without undergoing the design process with an experienced engineering firm, there’s a chance that the septic system won’t work properly for the property. This means waste water won’t be treated efficiently and could lead to sewage backup in the home’s plumbing. Whether the site is a new construction project or you’re looking to sell a property with an old tank in place, you’ll need to update it before the property can go on the market. By hiring a professional engineering firm to handle the septic design, you’ll guarantee that the system meets current building codes and can pass any city or county inspections.

For more information, contact Morse Engineering and Construction.

Source: connect2local


Buying a Lakefront Home with a Septic System

- Friday, December 02, 2022
Morse Engineering and Construction - Septic System

It can be a very frustrating and costly mistake not to understand all the requirements of waste disposal at your new lakefront home…especially in Massachusetts.

A. Town Sewerage

To avoid some of the problems involved with on-site septic waste disposal systems, many lakefront homeowners take advantage of connecting their homes to the municipal sewer system. Connecting to the sewer system can reduce the potential for environmental contamination and health hazards caused by old septic systems and cesspools, and offer a cost-effective alternative to systems that require pump-outs and often need expensive repairs.

To connect to town sewerage, homeowners obtain quotes for private contractors to connect their property to the sewer line/stub in the street. The work also entails a proper abandonment of the old waste system according to relevant specifications.

If the property you are looking at has town sewerage, it could be important to research town records to see that the work was completed with proper adherence to laws and regulations.

In addition, it is important to ask if there are any outstanding betterment fees and what party is responsible for paying those fees at Closing. Most of the time, this is the Seller’s responsibility. However, it can be a negotiating tool.

A sewer betterment assessment is a fee assessed by municipalities to properties that have been “bettered” by the construction of a public sewer. The value of those properties are said to have been improved and therefore, are “bettered”.

What about Septic Systems?

The purpose of a septic system is to retain solid waste in the tank and to dispose of effluent waste water into the ground without contaminating the environment.

In simplest terms, a septic system consists of a holding tank which retains solid waste and grease from household waste water, and an absorption system or “leach field” which disposes of liquid wastewater or “effluent” which leaves the septic tank for absorption below ground into soils at the property.

Typical Septic System

Properly designed and installed on-site septic systems are very functional and sanitary. Private septic systems serve more homes in the US and many other countries than any other waste disposal method. However, components can be costly and do not have an indefinite life. Therefore, there are some questions that you will want to ask.

First, the best information you can obtain is a copy of the as-built septic plan. This is usually recorded with the Town Board of Health. This plan tells you exactly where the septic system is located.

You’d probably want to know how often the septic system has been pumped and whether it has a current Title 5 Inspection.

With conventional septic systems, it is always a good idea to conserve water whenever possible. You’ll want to choose commercial drain cleaners carefully, as many may be harmful to the groundwater and to your leach field. When septic systems are not pumped routinely, the leach field may become clogged. Bleach, drain cleaners, chemicals and paints may harm beneficial microorganisms essential to the systems operation. And, as a general rule, garbage disposals cannot be used with septic systems.

Septic systems that are designed, installed, and operated properly will treat wastewater as well as any municipal sewage system. In fact, some septic systems do a much better job! The tanks will require pumping every 3 to 5 years.

Cesspools

A cesspool combines the septic treatment tank and absorption system into a single component. In its most basic and traditional form a cesspool is a hole in the ground lined with stone or concrete block to form a masonry-lined pit into which sewage is discharged. Solids (sewage from the building) remain in the pit, effluent is absorbed into soil below and at the sides of the cesspool. Cesspools as a means to dispose of sewage have been around since the late 1400’s at the beginning of the Renaissance. Cesspools require pumping every 1 to 2 years at a cost of approximately $200 to $300.

The concern with cesspools is that they may overload the capacity of the soil to remove bacteria, viruses, and phosphorous, and to nitrify ammonia and organic nitrogen compounds. Some communities will fail cesspools automatically via Title 5 regulations. Some accept them if they are functioning properly and meet other criteria. It is important to understand what you are buying.

Tight Tanks

Tight tanks are similar to septic tanks, except that they have no outlet and must be pumped out at regular intervals…usually monthly. Title 5 strongly discourages the use of tight tanks, but they are allowed in situations where an existing system has failed and there is no other feasible alternative. Tight tanks are not allowed for new construction or increases in design flow.

When purchasing a home with a tight tank, you’ll want to request copies of maintenance invoices for the last year. Then, determine the usage of your family and how that will impact those costs. Normally, tight tanks are sized from 1500 to 2500 gallons. Each pumping can cost from $175 to $250 (assuming frequency discounts).

For more information, contact Morse Engineering and Construction.

Source: lakefrontliving.com


Warm Thanksgiving Wishes to You All

- Friday, November 18, 2022

Happy Thanksgiving

Our path to personal and professional success is paved by- and with- the quality souls with whom we have surrounded ourselves. And, we consider you a member of our extremely valued fraternity of customers, vendors, service providers, mentors, and friends. It has been a strange couple of years, and we all have each other to thank for surviving and thriving. For this we give thanks.

This Thanksgiving we would like to use this week's blog to communicate our heartfelt appreciation for all the support, loyalty, service quality, and passion for our business we have received this past year. Going forward, our commitment is to even better strengthen our business and our relationships throughout into 2023 and beyond.

Warm Thanksgiving wishes, to you all.


Common Septic Tank Issues During Winter

- Friday, November 11, 2022
Morse Engineering and Construction

Frosty weather can cause significant trouble to residential and commercial septic systems. During the cold season, several issues may arise and can impair the water treatment. From the freezing ground to freezing pipes and tanks, all of these can cause major damage to septic systems.

Determining what complications to expect and how to prevent them is key to a winter without any setbacks in septic systems. Here are some septic system issues and helpful tips on how to deal with them:

Freezing Septic Tanks and Pipes

Frozen tanks and pipes are the most common problem for septic systems. Once snow or frost falls around the septic tanks and surrounding areas, problems may arise. When the components of a septic system freeze, it slows down or stops natural bacteria from breaking down waste in the tank. If the wastewater is not sufficiently broken down, the system can be overloaded and may cause clogging. Additionally, if the wastewater accumulates in a frozen line and ruptures, this poses a significant health hazard.

How to deal with it?

  • Set up a cover on a septic tank or simply cover it with a blanket during winter, particularly at night.
  • Running the water and using your septic tank every day will also reduce the possibility of freezing.
  • Mulch, leaves, or plants are also a recommended cover for your pipes.
  • Avoid cutting grass in the soil treatment area at the end of fall. The extra grass length can help trap the snow, providing insulation over the field.

Snow and Soil Pressure

Be careful where you park your vehicle as it can cause compacted soil and snow. Ensure that there are no heavy objects in the area above the septic system. Compacted soil and snow above could reduce the insulation of your septic system and build pressure to solidify the septic tanks. This will impede the proper treatment and drainage of the wastewater in the draining fields.

How to deal with it?

To prevent these issues, aerate the soil around your system before the winter season arrives. Aside from that, clear the snow from your septic system, but stop moving around where your system is installed.

Overused/Improper Use by the Guests

Winter is also holiday season meaning there are more celebrations and parties, and more meal planning and increased visitors. Your septic system could be overworked with additional shower and toilet use, laundry, and food preparation.

How to deal with it?

Try arranging a scheduled time for showers and dishes. Besides that, remind visitors of the proper use of the bathroom and kitchen sinks when staying with you.

Irregular Usage

The process of digesting organic waste by anaerobic bacteria keeps the septic tank warm. This is why irregular use of water during cold weather can affect the septic system.

Using warm water on a daily basis will also help keep pipes from freezing. When septic tanks are not used frequently, they are more prone to freezing. In unoccupied properties, systems are unable to sustain a constant temperature due to the low level of water and sewage that flow through the system. This can cause damage to the septic system.

How to deal with it?

If you or your family are planning to be away during the winter, empty your septic tank. You should schedule a pumping first before traveling to help keep the septic tank parts from freezing and bursting.

Breach in Water Pipes

Faulty pipes can worsen the possibility of damage in the winter season.

Leaks during the cold weather will also increase the chances of freezing, which will further weaken the system. Clogs cause the wastewater to accumulate in the pipes. Frozen drainage can end up causing damage to the septic tank, which can also contaminate drinking water.

How to deal with it?

These problems can be solved by replacing or fixing leaky pipes before the winter arrives. Also, both clogs and leaks should be taken care of as soon as they are spotted in order to avoid these problems from becoming severe.

The best way to avoid these problems is by taking precautions and making preparations before the cold weather begins. Homeowners need to ensure that their septic systems are fault-free and not prone to freezing.

For more information, contact Morse Engineering and Construction.

Source: build-review.com


Conditional Pass or Failed Septic System Inspections

- Friday, November 04, 2022
Morse Engineering and Construction Industries - Septic System Inspection

A system with certain components which need repair or replacement can qualify for a conditional pass on the inspection report. Upon completion of replacement or repair of the specific system component, and with the approval of the Board of Health, the system will pass inspection.

Examples of system components eligible for a conditional pass include:

  • A metal or cracked septic tank,
  • A broken or obstructed pipe,
  • An uneven distribution box,
  • A malfunctioning pump chamber.
  • Soil absorption systems and cesspools cannot be repaired under a conditional pass.

If a system fails inspection and the owner decides not to sell as a result, the owner still has an obligation to repair the system.

A failed system must be upgraded within 2 years, unless the local Board of Health or MassDEP authorizes an alternative schedule.

The septic system inspector is responsible for determining that the system meets or fails Title 5 standards as of the date of the inspection. If a system fails shortly after a sale, the buyer may have legal recourse, but it may be very hard to prove that the system was in failure at the time of the inspection.

Source: mass.gov