Title V Septic Regulations and Home Sales

- Monday, June 05, 2023
Morse Engineering and Construction - Title V Septic Regulations

My septic system failed. What do I do now?

If the inspection fails, your septic system must be repaired or replaced. If ownership of the house is not being changed, the homeowner may have up to two years to complete the repair. However, if the Health Agent deems the failure to be a health hazard, the homeowner can be required to begin the process of repairing it immediately.

Failed septic systems can be handled in a real estate sales transaction in two ways. First, the seller can undertake the work and complete it prior to closing, with a full sign off from the Board of Health. This is often the preferable course for all parties and the lender. Alternatively, the parties can agree to an escrow holdback to cover the cost of the septic repair plus a contingency reserve, and the work is undertaken after the closing. Some lenders don’t allow septic holdbacks, however.

What are the steps and permitting fees to install a new septic system?

The first step in beginning a septic repair is to hire an engineer to evaluate your land and to design a system that would be appropriate for your property. Once the engineer is hired, a percolation or “perc” test is scheduled. The perc test measures the rate at which water is absorbed into the ground and determines whether the soil is suitable for a septic system. Based on the results of the perc test, the size of your lot, and the number of bedrooms in your home, the engineer designs a septic system to serve the property. Once the plans have been drawn, four copies of the plans, two copies of the soil analysis, and a fee must be submitted to the Board of Health office. The BOH has 45 days to review the plans and to either approve or reject them. If the plans are approved, the plans can be picked up and the installation of the system can begin. If the plans are rejected, the plans must be revised and an additional fee is charged to have them reviewed again. If the designed system requires state variances (done by the Department of Environmental Protection), an additional 90 days must be allotted for the review process.

When the job is completed is there any form of certification that it has been done and that it meets Title V standards?

At the completion of the job, (that is, when all work has been done according to the plans; when the engineer has submitted an “as-built” plan as to where the system was installed; and when the installer has submitted a certification statement), the Health Agent signs a Certificate of Compliance, (COC), which is issued to the installer. Upon payment for the work, the installer gives the COC to the homeowner.

For more information, contact Morse Engineering and Construction.