Steps to a Successful Septic Site Plan

- Wednesday, August 06, 2025
Morse Engineering and Construction - Sanitary Sewer System

Here’s a step-by-step guide for homeowners and landowners embarking on septic system planning in Massachusetts:

  • Hire a licensed soil evaluator to conduct site and soil tests.
  • Consult a septic system designer or engineer familiar with state and local regulations.
  • Work with your designer to develop a site plan that meets all setback, sizing, and reserve area requirements.
  • Submit the plan for review to your local Board of Health and, if applicable, the Conservation Commission.
  • Address any feedback or requests for revisions from regulators.
  • Once approved, hire a licensed installer to construct the system in accordance with the approved plan.
  • Schedule inspections as required by Title 5 and local authorities during and after installation.
  • Maintain records of the system design, installation, and any maintenance or repairs for future reference and resale.

For more information, contact Morse Engineering and Construction.